Updated November 2026

Learning how to installing laminate flooring comes down to three things: preparing the subfloor, laying the planks in a staggered pattern, and leaving a gap at the walls so the floor can move. Done correctly, you end up with a floating floor that clicks together tightly, looks clean, and holds up to daily foot traffic. Most rooms can be finished over a weekend if the subfloor is in good shape.

Prepare the Room and Subfloor

Start by clearing the room and removing baseboards or shoe molding. Pull off any old flooring, then check the subfloor for squeaks, loose boards, and humps. Laminate needs a flat surface, so sand down high spots and fill low ones with leveling compound. Most manufacturers call for a flatness tolerance of about 3/16 inch over 10 feet, so check with a straightedge.

Shopping for one? See our guide: 7 Best Laminate Flooring Installation Tools for DIY Renovators (2026).

Next, lay down the underlayment specified by your laminate maker. Many floors come with an attached pad, but if yours doesn’t, roll out a separate foam or cork underlayment and tape the seams. Plan on running a vapor barrier over concrete slabs. Your flooring instructions will tell you whether that is required.

Measure, Plan the Layout, and Acclimate the Planks

Measure the room’s length and width, then multiply to get square footage. Add about 10 percent for cuts and waste. Open the boxes and let the planks sit in the room for 48 hours, since the material needs to adjust to the room’s temperature and humidity before you fasten it down.

Plan your starting wall. The longest straight wall is usually best, and you should run planks parallel to the main light source, which hides seams. Stagger the end joints by at least 6 inches from row to row so no joints line up. If you are unsure how to measure your space accurately, see How to Measure a Room for Flooring Accurately before you order material.

Install the First Rows and Keep Expansion Gaps

Begin in the corner nearest your starting wall. Place spacers (usually 1/4 to 3/8 inch, as specified by the manufacturer) against the wall. Lock the long edge of the first plank into the second, then angle the short end in and press down until it clicks. Work row by row, keeping each joint snug and checking that the rows stay straight.

For cuts at the last row, measure the plank, score it, and snap or saw it to fit. A clean cut matters at the edges, so the guide on How to Cut Laminate Flooring Cleanly: A Step-by-Step Guide walks through the tools and technique. Leave the expansion gap at every wall, including around door frames and pipes.

Finish the Edges and Transitions

Once the floor is down, cover the expansion gap with baseboards or quarter-round trim. Nail or glue the trim to the wall, not the floor, so the laminate can float. Install transition strips at doorways and where the laminate meets tile or carpet. Transition strips make a clean line and protect the edges from chipping.

Tools and Supplies Checklist

  1. Tape measure and straightedge
  2. Pull bar and tapping block
  3. Spacers for the expansion gap
  4. Jigsaw or circular saw with a fine-tooth blade
  5. Underlayment and vapor barrier
  6. Utility knife and speed square
  7. Safety glasses and knee pads
  • A pull bar and tapping block help you lock the last row tightly without damaging the joint edges. View on Amazon
  • Foam or cork underlayment cushions the floor and reduces noise, and many buyers choose it for its moisture resistance. View on Amazon
  • A pad of knee protection makes long installation sessions easier on your joints. View on Amazon

Common Mistakes to Avoid

  • Skipping acclimation, which can cause planks to gap or buckle later.
  • Forgetting the expansion gap, so the floor pushes against the walls.
  • Lining up end joints in neat columns, which weakens the look and the lock.
  • Nailing trim into the floor, which stops the laminate from floating.
  • Skipping the subfloor check, leaving bumps to show through the finished surface.

FAQ

Can I install laminate flooring over existing tile?

Often yes, if the tile is level and firmly bonded. Grout lines and high edges can telegraph through the laminate, so many installers level the surface first. Check your flooring maker’s guidelines before proceeding.

How long does it take to install laminate flooring?

A typical 200 square foot room can take a beginner one to two days, including prep. Cutting around doors and fixtures adds time, so plan extra hours for a room with many obstacles.

Do I need to remove baseboards before installing laminate?

In most cases, yes. Removing baseboards lets the planks slide under the trim and leaves room for the expansion gap, which is then hidden by reinstalled trim. We also found How to Pull Up Laminate Flooring: A Step-by-Step Guide for Beginners useful on this point.

Conclusion

With a flat subfloor, a staggered layout, and proper expansion gaps, you can complete a laminate floor that looks professional. Take your time on the first two rows, since they set the alignment for the whole room. Check the official instructions from your flooring maker for product-specific details.

Owen Palmer

About Owen Palmer

Owen Palmer is part of our editorial team and reviews and edits our DIY home renovation guides, checking product details against manufacturer specifications and owner feedback.