Tiling a roof is a demanding project, but it follows a clear sequence. Done correctly, how to tile roof installation comes down to four things: a sound deck, a waterproof underlayment, properly spaced battens, and tiles that are fixed and flashed so water never reaches the structure. This guide walks through each stage so you know what to expect before you climb the ladder.

Before You Start: Safety and Structural Checks

Roof tile is heavy. A typical concrete tile weighs several pounds each, and a full roof adds substantial dead load. Before you order materials, confirm that your rafters and trusses can carry the added weight, especially if you are replacing a lighter roofing material. A structural engineer or a licensed roofer can check this for you, and many local building departments require it for a change in roof load.

Shopping for one? See our guide: How Much Is Tile Installation Per Sq Ft? 6 Best Options Compared (2026).

Plan your access and fall protection too. Use a sturdy extension ladder, a roof harness anchored to a rated point, and a helper on the ground for handing up material. Never work on a wet or frosted roof.

Step 1: Inspect and Prepare the Roof Deck

The deck is the foundation of the whole system. Remove old roofing down to the sheathing, then check each board or panel for rot, delamination and loose nails. Replace damaged sections and renail any loose ones. The surface should be flat enough that the battens and tiles will sit without rocking. Sweep the deck clean so debris does not trap moisture under the underlayment.

Check that the roof pitch meets the minimum your tile manufacturer specifies. Many concrete and clay tiles need a pitch of at least 2.5:12 or higher, and lower pitches usually require special sealing or a different product. Confirm this before you buy.

Step 2: Install the Underlayment and Flashing

Lay the underlayment horizontally, starting at the eave and working up toward the ridge. Overlap each course according to the manufacturer’s directions, usually a few inches at the sides and more at the ends, so water always runs over the seams and not into them. Staple it in place with corrosion-resistant fasteners, and keep it taut without tearing it.

  1. Install drip edge along the eaves and rakes before the underlayment.
  2. Run a continuous valley liner or metal valley flashing down every valley.
  3. Seal around vents, chimneys and skylights with the proper flashing kits.
  4. Add ice and water shield at the eaves and in valleys where your climate requires it.

Step 3: Set the Battens and Tile Layout

Battens are the horizontal strips that hold the tiles. Measure the tile exposure, which is the portion of each tile left visible after the next course overlaps it, and mark batten locations from the eave upward. Use a chalk line to keep them straight. Spacing must match the tile profile exactly, so check the manufacturer’s batten gauge table rather than guessing.

Snap a centerline and dry-lay a few courses to check alignment. Plan the cuts at the rakes and hips so you do not end up with a sliver of tile at the edge. Adjust the starting course if needed to balance the layout.

Stage What to check
Deck Flat, sound, free of debris
Underlayment Correct overlap, no tears, secured
Battens Spacing matches tile gauge table
Layout Straight courses, balanced cuts at edges

Step 4: Lay and Fasten the Tiles

Start at the eave and work up, placing the first course with the correct starter or eave tile. Hook or fasten each tile according to its design, and follow the manufacturer’s fastening schedule, which often calls for a clip or nail at specific locations, particularly in high-wind zones. Keep every course aligned to your chalk lines and check the lap as you go.

Cut tiles with a diamond blade on a wet saw or angle grinder, wearing eye and lung protection. Make cuts at the rakes, around vents and along hips. Set ridge and hip tiles last, bedding them as the manufacturer specifies.

Step 5: Finish the Ridge and Check for Leaks

Install the ridge caps and any ventilation components, then walk the roof in a safe manner and look for loose or cracked tiles. After a light rain, inspect the attic and the underside of the deck for any staining or moisture. Catching a small leak early is far easier than repairing rot later.

Common Mistakes

  • Skipping the manufacturer’s batten gauge and assuming spacing is close enough.
  • Overlapping the underlayment in the wrong direction, which channels water under it.
  • Undersizing or omitting flashing at penetrations, the most common leak source.
  • Ignoring wind-zone fastening requirements in exposed areas.
  • Working alone on a steep roof without fall protection.
  • Diamond blade wet saw: makes clean, chip-free cuts through concrete and clay tile. View on Amazon
  • Roofing harness and lanyard: keeps you anchored on a steep pitch. View on Amazon
  • Chalk line reel: marks straight batten and course lines across the full roof. View on Amazon
  • Corrosion-resistant roofing nails: hold underlayment and battens without rusting. View on Amazon

FAQ

How much of a roof can one person tile in a day?

Output depends on roof size, pitch and cuts. Many experienced DIYers plan on a small section per day, and a full roof often takes several days or more. Build in time for weather and inspection.

Do I need a permit to tile a roof?

Often yes, especially if you change the roof load or structure. Check with your local building department before starting.

What pitch is needed for roof tile?

Requirements vary by product. Many concrete and clay tiles need a minimum pitch of around 2.5:12, but always follow your manufacturer’s specification.

Can I tile over old roofing?

Some manufacturers and codes allow it, but the deck must be sound and the added weight must be acceptable. Removing old material is usually the safer choice.

Should I hire a professional?

For steep, complex or structurally questionable roofs, a licensed roofer or structural engineer is a sound choice. Consult a professional for advice specific to your home.

Conclusion

Learning how to tile roof installation is mostly about sequence and precision. Prepare a sound deck, install underlayment and flashing carefully, set battens to the manufacturer’s gauge, and fasten every tile correctly. Take safety seriously, and when in doubt, get expert input before you commit.